




Luachimo Hydroelectric Power Plant
Business Area
Management and Supervision
Project Type
Energy and Water
Location
North Lunda
Project Description
The Rehabilitation and Power Upgrade of the Luachimo Hydroelectric Plant includes the following work: Rehabilitation of the existing hydromechanical equipment at the Luachimo dam, specifically: the two main spillway gates and their operating mechanisms, the three components of the co-flow gate and their operating mechanisms, the replacement of the bottom outlet gate with a new segment-type gate, and the complete overhaul of the electrical systems; Construction of a new hydraulic circuit, designed for 240 m³/s, consisting of an intake, an adduction channel, a head chamber, and a return channel; Construction of a new hydroelectric power plant, located next to the existing plant, equipped with four generator sets with a unit capacity of 8.2 MW; Construction of a new 60-kV substation on a platform located next to the new hydroelectric power plant; Renovation of the access road between the Luachimo Dam and Dundo, and construction of access roads to the power plant, the intake chamber, and the substation.
Other projects:



